Close
Online Enquiry
Name *
Phone *
Email *
Enquiry
* Required fields

Contact Us

To book in your next job or if you have any questions please don't hesitate to contact our office. There is someone waiting for your call right now!

 

Phone

(03) 9722 1111

 

Fax

(03) 9722 1148

 

Email

sales@concretepumping.com.au

 

Postal Address

PO. BOX 5100, Wonga Park, VIC 3115

Over 35 Years Experience

Book A Pump make an enquiry

Rates

10% GST to be added to prices 

Concrete Pump Hire Rates

Minimum 4hr charge for AM
Minimum 3hr charge for PM

  Hourly Rate Cubic Meter Travel Time 1 Hour

Line Pump

$150 $7 $150

25 METRE BOOM PUMP

$150 $7 $150

28 METRE BOOM PUMP

$160 $7 $160

33 METRE BOOM PUMP

$170 $7

$170

37 METRE BOOM PUMP

$190 $7

$190

 

Saturday

All Saturday concrete pump hire charged out of AM 4 hours minimum hire plus cubic metre rate and one hour travel - as above.

 

Penalty Rates

will be incurred on Monday to Fridays when pumping commences before 6 am or when pumping continues after 4 pm or where pumping continues after 12 noon Saturdays. This penalty rate which is additional to normal rates of hire is $50.00 per hour for work or part thereof before or after these periods.

 

Cancellation Fee

A late cancellation fee of $250 will apply when reasonable notice is not given regarding cancellation of the concrete pump. An on-site cancellation fee (equal to the applicable minimum hire charge) will apply when the concrete pump is either on-site or in transit to the job site when the pour is cancelled or the wrong type of concrete pump is ordered for the job

 

Additional Pipe

An additional rate will apply when any part of the pumping distance exceeds sixty lineal metres. Maximum calculated pumping distance must be advised when ordering concrete pump. The following rates will apply for the duration of the pump hire.

 

Maximum pumping distance

60 - 80 metres

Additional $20.00 per hour

Additional $1.00 per metre

80 metres plus

price on application

 

Customer Responsibility

It is the customers responsibility to provide and advise:

  • Type of job site - Residential, Semi Commercial or Full Commercial
  • Clear site access
  • Specify clearances from power lines or have power disconnected and/or lines covered
  • Specify concrete to suit the type of concrete pump ordered. Minimum 20mpa
  • Towing from site to hard standing ground if it is required at customers cost
  • Traffic management and permit for concrete pump enable blocking off roads, laneways, etc.
  • If concrete strength ordered is above 25 mpa or additives have been requested
  • Suitable washout area to comply with Council and EPA Guidelines and Regualtions

This price list is to be read in conjuction with Gateway Concrete Pumping Pty Ltd's

Terms and Conditions of Contract.

10% GST to be added to all the above prices

 

 

Careers at Gateway Concrete Pumping Click Here